Ground Handling at VECC Airport / CCU Airport / KOLKATA Airport
Ground Handling Company at VECC Kolkata Airport
Share:
AIRPORT NAME: Netaji Subhash Chandra Bose International Airport / INTERNATIONAL
ICAO CODE: VECC AIRPORT
IATA CODE: CCU AIRPORT
CITY KOLKATA
AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT
1 ARP coordinates and site at AD 223914N 0882648E01.75° /1294M from THR 01R
2 Direction and Distance from City 045°/15KM from Howrah Railway Station
3 Elevation/Reference temperature 23 FT / 36.0°C
4 MAG VAR/Annual change 0.45°W (1985) /0.000E
5 Types of traffic permitted IFR/VFR
OPERATIONAL HOURS AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT
1 AIRPORT HOURS AT VECC AIRPORT / CCU AIRPORT:: H24
2 RESTRICTIONS AT VECC AIRPORT / CCU AIRPORT: NIL
3 CUSTOMS AND IMMIGRATION AT VECC AIRPORT / CCU AIRPORT: YES
4 PORT OF ENTRY/ EXIT AT VECC AIRPORT / CCU AIRPORT: YES
5 SLOTS/PPR REQUIREMENTS AT VECC AIRPORT / CCU AIRPORT: YES,You can email us at ops@bizaviation.net to apply and coordinate slots.
6 GROUND HANDLER/ SUPERVISORY AGENT at VECC AIRPORT / CCU AIRPORT BizAv International Pvt LtdYou can email us at ops@bizaviation.net to arrange Ground Handling.
7 HEALTH AND SANITATION AT VECC AIRPORT / CCU AIRPORT: H24 Doctor Available on call basis & First Aid Room available
8 AIS BRIEFING OFFICE AT VECC AIRPORT / CCU AIRPORT: H24
9 ATS reporting office (ARO) AT VECC AIRPORT / CCU AIRPORT: H24
10 MET BRIEFING OFFICE AT VECC AIRPORT / CCU AIRPORT: H24
11 ATS AT VECC AIRPORT / CCU AIRPORT: H24
12 FUELING AT VECC AIRPORT / CCU AIRPORT: H24You can email us at ops@bizaviation.net to arrange fuelling.
13 SECURITY AT VECC AIRPORT / CCU AIRPORT: H24
14 DE-ICING AT VECC AIRPORT / CCU AIRPORT: NIL
15 HANGAR SPACE FOR VISITING AIRCRAFT AT VECC AIRPORT / CCU AIRPORT: NIL
16 CATERING AT VECC AIRPORT / CCU AIRPORT: You can email us at ops@bizaviation.net to arrange catering.
CREW / PASSENGER FACILITIES AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT
1 HOTELS AVAILABLE AT CITY SIDE.You can email us at ops@bizaviation.net to book hotel.
2 RESTAURANTS AVAILABLE
3 CITY SIDE TRANSPORTATION AVAILABLEYou can email us at ops@bizaviation.net to book transportation

RESCUE AND FIRE FIGHTING SERVICES AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT

1 AD category for fire fighting H-24:CAT IX
2 Rescue equipment AVBL. as per category
3 Capability for removal of disabled aircraft Available For Removal Of Upto B707 Type Of Aircraft

DECLARED DISTANCES AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT

RWY designator TORA(M) TODA(M) ASDA(M) LDA(M) Remarks
01L 2839 2839 2839 2839 RESA 130 X 90 M
19R 2839 2839 2839 2749 NIL
01R 3627 3627 3627 3627 RESA 90 X 90 M
19L 3627 3627 3627 3200 RESA 240 X 90M

PHYSICAL CHARACTERISTICS AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT

Designations RWYNR TRUE & MAG BRG Dimensions of RWYM Strength (PCN) and surface of RWY and SWY THR coordinates THR elevation and highest elevation of TDZ of precision APP RWY (FT)
01L 6.25° GEO7.00° MAG 2839 x 45 PCN 45 F/C/W/T.Bitumen 223824.71N 0882638.37E THR:19.0FT
19R 186.25° GEO187.00° MAG 2839 x 45 PCN 45 F/C/W/T.Bitumen 223953.64N 0882648.82E THR:19.0FT
01R 6.25° GEO7.00° MAG 3627 x 45 PCN 84 F/C/W/TBitumen 223831.91N 0882646.73E THR:20.0FTTDZ:20.2FT
19L 186.25° GEO187.00° MAG 3627 x 45 PCN 84 F/C/W/TBitumen 224014.70N 0882657.80E THR:19.0FTTDZ:19.8FT

APPROACH AND RUNWAY LIGHTING AT VECC AIRPORT / CCU AIRPORT / KOLKATA AIRPORT

Designations RWY APCH LGT TYPE LEN INTST THR LGT

COLOUR WBAR

VASIS(MEHT)

PAPI

TDZ, LGT LEN RWY centre line LGT

Length, spacing, colour and intensity

RWY edge LGT

Length, spacing, colour and intensity

01R CAT – I900M Green PAPILEFT/3°

(50FT)

Nil 3627M30M

Variable

White

3627M60M,WHITE (Last600m amber)

LIH

19L CAT- II900M GreenWbar PAPILEFT/3°

(50FT)

900Mspacing

30M

3200M,30M

Variable White from 900M to 300M from RWY end and Red from 300M to RWY end

3627M60M,WHITE (Last600m amber)

LIH

01L SALS305M Green PAPILEFT/3°

(50FT)

Nil Nil 2839M60M,WHITE (Last600m amber)

LIH

19R SALS427M Green PAPILEFT/3°

(50FT)

Nil Nil 2839M60M,WHITE (Last600m amber)

LIH

VECC Landing Permit Notice Period: It takes 03 working days to obtain a landing permit (flight should operate on 4th day) except flights originating from PRC countries i.e., China, North Korea, Pakistan, Afghanistan, Iraq, Somalia, and Nigeria. It takes 07 working days to obtain landing permission for flights originating from PRC countries (flight should operate on the 8th day).

Crew visa requirements for GA flights in India: All general aviation crew arriving in India must carry with them a valid BUSINESS VISA issued by the Indian Embassy / Consulate or an E-BUSINESS VISA available online.

Crew can apply for e-business visa online: https://indianvisaonline.gov.in/evisa/tvoa.html

Our team will be happy to assist crew with any requirement to obtain Indian business visa or E-BUSINESS VISA available online.

Pax visa requirements for GA flights in India: All Pax must arrive with valid Indian visa or Indian e-visa (available online).

Pax can apply for e-visa online: https://indianvisaonline.gov.in/evisa/tvoa.html

Remarks: It is mandatory regulation to carry tow bar on board the aircraft in India, Self-power out parking stands are subject to availability. Tow bar for most of the business jets are available on ground at Major airports with the handler. Kindly check the availability of tow bar on ground at the airport prior to operation

Note: Information given in above article are subject to change from time to time, for latest information please feel free to contact us.

If you have any questions about this article or would like assistance planning your next flight to India, contact us ops@bizaviation.net or (OPS)- (+91)-93 11 11 11 96.

You can also read our blog on business aircraft ops to Major International Airports in India  : VIDP Airport  (Delhi airport), VABB Airport (Mumbai airport), VOBL airport (Bangalore airport),VOMM  Airport ( Chennai Airport), VOGO airport (Goa Airport) , VECC  airport (Kolkata Airport), VOCL airport (Calicut Airport),VAAH airport ( Ahmedabad Airport) VOTV airport ( Trivandrum Airport), VILK airport (Lucknow Airport), VIAR airport (Amritsar Airport), VOTR airport (Trichy Airport), VIJP airport (Jaipur Airport), VOCI airport (Cochin Airport), VAPO airport (Pune Airport), VANP airport (Nagpur Airport),VOCB airport ( Coimbatore Airport), VEGY Airport (Gaya Airport), VEDB Airport (Bag Dogra Airport), VEGT Airport (Guwahati Airport),VEBN Airport ( Varanasi Airport), VICG airport (Chandigarh Airport), VOVZ airport ( Vishakhapatnam Airport), VOMD airport  (Madurai Airport) and VOPB airport ( Port Blair Airport), VOKN Airport (Kannur Airport), VASU Airport (Surat Airport), VAID Airport (Indore Airport), VIAG Airport (Kheria Airport), VOGA Airport(Mopa Airport), VEBS Airport(Bhubaneswar), VOHS Airport(Hyderabad Airport), VEIM Airport (Imphal Airport), VEPT Airport (Patna Airport), VOML Airport(Mangalore Airport), VOBZ Airport(Vijaywada Airport), VAMA Airport(Mundra Airport), VISR Airport (Sri Nagar Airport), Raipur Airport (VARP Airport)